Planning period: 2013-2015 Delivery time: 2017 Gross floor area: 1890 m2 General contractor: T-Trans Főép Kft. The personnel of the Center for the Prevention of Terrorism (TEK) in Paks must perform their protection tasks during the entire operation period of the power plant units already in operation and to be planned. The technical condition of their old building did not allow it to be renovated or expanded to such an extent that it would ensure the placement of the stock for the above period. Due to the above, a decision was made to demolish the existing building and build a new barracks building.

Paks TEK

Paks, Gesztenyés utca